We have now done the first flow measurements in the 11 streams at the same segments where we have the flowmeters located. These first measurements were done at low flow situations (low water levels), and we will repeat this under medium and high flows also, to get good data on the flow at different water levels. Then we get data on flow with 1 hours resolution by combining the flow measure data with the water level data. The photos show some of the field work in the different streams.